Overview
Fast Specifics
- Location of Origin:
-
Zhejiang, China
- Manufacturer Title:
-
EPT
- Model Number:
-
twenty-63
- Technics:
-
Injection
- Connection:
-
Welding, Scorching Soften
- Form:
-
Equivalent
- Head Code:
-
Round
- Product Title:
-
PPR Male Threaded Coupling
- Content:
-
PPR
- Software:
-
Join pipes
- Functioning stress:
-
2.5Mpa
- Temperature:
-
-ten~95℃
- Coloration:
-
white,environmentally friendly
- Common:
-
ISO, DIN
- Life Span:
-
fifty a long time
- Certification:
-
ISO ASTM BS
Packaging & Supply
- Selling Units:
- Single item
- Single bundle dimensions:
- 13X12X11 cm
- One gross fat:
- .five hundred kg
- Deal Kind:
- Carton
- Picture Instance:
-
Guide Time
: -
Amount(Pieces) one - five hundred 501 - 5000 >5000 Est. Time(days) seven 15 To be negotiated
Online Customization
Solution Description
Place Of Origin |
Henan |
Manufacturer |
ISUPIPE |
Model |
20-63 |
Materials |
PPR |
Kind |
Male Coupling |
Specifications |
20-63mm |
Application |
Connect pipes |
Connection |
Sizzling Soften |
Tough a long time |
fifty Many years |
OEM |
Accessible |
Certifation |
ISO,ASTM,BS |
Characteristic
(1) High Temperature Resistance: the maximum sustained working temperature is up to 70 Degrees Celsius, the highest transient temperature is up to 95 Levels Celsius.
(2) Heat Preservation: low thermal conductivity which is only 1/1500 of brass pipe, and 1/250 of metal pipe.
Non-toxic: no heavy metallic additives would not be covered with filthy or contaminated by bacterium.
(three) Corrosion Resistant: resist chemical issues or electron chemical corrosion.
(4) Reduced Set up Fees: light weight and ease of installation can lessen set up costs by as much as 50% above steel piping system.
(5) Higher Flow Capacity: smooth inside partitions result in reduce strain loss and higher volume than metal pipes.
(six) Lengthy Existence: far more than fifty many years under normal conditions.
(seven) Recycled and Setting-friendly.
Associated Items
Firm Data
In purchase to adapt to the advancement of international trade, to generate a total variety of item systems, to assist the high-finish model brand ISUPIPE export tailored business, we recognized ISU(Henan) Industrial Co.,Ltd. We are suppoted by Libin Plastic Pipe, Huitong Plastic Pipe, Yagene Plastic Pipe and Aijia Plastic Industry Co., Ltd. The four businesses are specialised in generating Plastic Pipes and pipe fittings for more than ten many years.We have a initial-class business office surroundings and present day administration method, have grow to be the advertising, design and e-commerce centre for the over four comapnies. With a extensive range, excellent good quality, affordable costs and fashionable styles, our goods are popular in both overseas and domestic market place.
ISU (Henan) Industrial Co., Ltd. will usually be committed to safeguarding the pursuits of buyers, improving services good quality and turning into the most specialist market benchmark! We welcome new and previous customers from all walks of daily life to speak to us for long term enterprise relationships and mutual success.
Packing & Delivery
FAQ
1.Are you manufacturing unit?
We have our possess factory 
2.How prolonged is your supply time?
Normally7-10 times right after obtaining your payment.But it can be negotiated dependent on get qty and generation routine.
three.What&aposs your payment phrases?
T/T, LIC, and so on.
4.Can I get the pre-manufacturing sample ?
Of course, we will send you pp sample, following you confirm, then we will start generation.
five.Can I combine different types?
Certain!
six.Can I get a lower cost if I get big portions?
Sure. less costly prices with much more even bigger dimensions orders.
seven.Can I add or delete items from my order if I change my head ?
Sure, but you need to inform us asap. If your get has been accomplished in our production line, we cannot modify it. It is about two days following confirming the get.
eight.How about the good quality ensure interval?
1 year!
9.How can you guarantee the manufacturing high quality?
Our manufacturing top quality stick to ROHS.Reach.UL expectations.We have four moments inspection for every single finished merchandise just before package deal 3rd element inspection acceptable.